How developers use West Kite.

West Kite brings parcel, ownership and building research into one place, so developers can investigate potential sites, understand who controls them and focus feasibility work on the opportunities that fit their project.

Tower crane above a building under construction

Development site selection starts with a clear mandate, then tests ownership, planning, physical constraints, access and economics. West Kite helps bring property context together so teams can focus their next round of investigation.

Understand the site before committing to it

An attractive location can become an unworkable project when access, utilities, site control or timing changes. Early research should reveal the questions that can change a go/no-go decision, before a concept becomes a commitment.

Start with the product you want to deliver, the market it serves and the land requirements it creates. Review parcel configuration and ownership together. An assemblage is a negotiation across interests, not simply adjacent polygons on a map.

A zoning designation is an input to a planning review. Allowed uses, height, setbacks, overlays and approval pathways can each change what is feasible. Keep an early capacity estimate distinct from a consultant-tested design.

A site’s value depends on what can be delivered, at what cost and on what schedule. Carry unresolved planning, utility and physical constraints into the assumptions your partners review.

Start with the project you intend to deliver

For infill and multifamily developers, an early screen often begins with whether a parcel can support the intended housing or mixed-use program. Site dimensions matter alongside area. Access, adjacent uses, existing improvements and the relationship between a potential building and its surroundings can influence the first design conversation. A large parcel is not automatically more useful than a smaller, better-configured site. Define the project brief before deciding which property fields should narrow the search.

Planning research should distinguish the map designation from the rules and approvals that apply to the actual proposal. Permitted uses, density, floor area, height, setbacks, parking and overlays may interact. Local definitions matter: the area counted toward a floor-area limit may differ from the total constructed or rentable area in a project model. In San Francisco, SF Planning’s zoning resources provide an official starting point. Resolve project-specific interpretation with the relevant planning authority and advisers.

For industrial developers, building size alone does not describe a viable site. Truck access, turning movements, loading, yard depth, circulation, drainage and utility requirements can affect the program. The surrounding transport network may be as important as straight-line distance to a market. A concept that fits inside a parcel boundary may still fail an operational requirement. Record those requirements early enough that acquisitions and design teams are screening for the same project.

Retail development adds a different set of questions about visibility, access, circulation and the people or businesses the location serves. A corner location may appear attractive on a map but require closer investigation of permitted access or site configuration. Tenant requirements, competing supply and the intended use should shape the first screen. Property context provides a foundation; the demand assessment and leasing assumptions must explain why the proposed space belongs in that location.

For data-center and other infrastructure-intensive development, power and timing can dominate the decision. Proximity to infrastructure is not a commitment that the necessary capacity will be available when the project needs it. Utility discussions should establish deliverable capacity, required work and a realistic schedule. Fiber, cooling, water, redundancy and local acceptance may also affect the program. Those investigations belong on the critical path, with capital commitments linked to evidence rather than a promising map.

Redevelopment and adaptive reuse begin with the additional question of what the existing asset can support. An ownership and parcel screen helps establish the property context, but the conversion thesis needs a technical review of the building itself. Existing occupancy, access, structural configuration, services and the scope of required work can change cost and timing. A building’s current use does not by itself establish that a different use is physically or legally achievable.

These distinctions explain why a single development-opportunity score can be misleading. A constraint that eliminates one project may be manageable for another. West Kite’s role is to help establish the property and ownership context around the question. Your team supplies the development mandate, tests the relevant constraints and decides which sites deserve more detailed work.

A connected view of early feasibility

Define the intended use, location, scale, access requirements and delivery horizon. Industrial, multifamily, retail and data-center projects need different screens; one universal score hides important tradeoffs.

Check boundaries, recorded ownership, adjacent interests and likely assemblage needs. Review access, easements and title questions with the appropriate professionals before assuming the whole mapped area is usable.

Consult current local planning records, flood information and other relevant sources. Ask utilities about capacity and timing. Document which findings are confirmed, inferred or still unresolved.

Test massing and net usable area, then revisit cost, timing and land assumptions. Move into professional diligence when the site warrants it, with a concise brief and source trail for the team.

Gross site area, developable area and permitted floor area are different concepts. A simple FAR calculation does not resolve easements, slope, setbacks, height limits, parking or the local definition of floor area. Use an early screen to frame the next question for an architect, planner or civil engineer.

The recorded owner is one part of the picture. Multiple parcels, leases, access rights and other interests can affect the path to a transaction. Keep an ownership map alongside the physical site plan, and identify where additional title or legal review is needed.

Utility capacity is useful only if it can be delivered on a workable timeline. An entitlement assumption matters because it affects time, cost and certainty. For complex projects, sequence investigations around the findings most likely to change the plan, rather than accumulating every available map layer.

A useful feasibility handoff records the parcel, intended use, relevant source dates, assumptions, exclusions and unresolved issues. That lets a consultant challenge an assumption without repeating every step that produced the shortlist.

Site control deserves the same care as physical feasibility. A mapped boundary does not describe every interest affecting the property. Multiple owners, existing occupiers, access arrangements and other rights may influence a transaction or a project schedule. Identify the questions early and route them to the right title, legal or technical adviser. Finding a potentially suitable parcel and establishing a workable path to control are related but separate stages.

Keep the economics connected to the site screen. A change in achievable area, approval timing or required infrastructure can change the amount a project can support for land. Revisit the acquisition assumption when the program changes rather than carrying an early number unchanged through the process. A feasibility model should explain the assumed uses, area basis, costs, schedule and completion scenario so that the team can see which inputs drive the conclusion.

A useful go/no-go brief is explicit about uncertainty. Name the intended project, identify the parcels, summarize confirmed findings and state the unresolved issues that could change the answer. Assign the next investigation to the appropriate person. If the site fails a requirement, record why; a rejected site can be useful market knowledge when the mandate or conditions change. If it passes the first screen, carry those assumptions forward for professional testing.

One place to start your research

West Kite gives development teams a connected starting point for commercial real estate site selection. Investigate the property and ownership context before committing more time to a site, and use that research to frame the planning, design and financial questions that matter.

When comparing West Kite with LightBox Vision or TestFit, define the decision first. LightBox Vision provides mapped property research; TestFit focuses on site feasibility and design options. West Kite connects parcel, ownership and building context for the early investigation. Evaluate the same site and ask which required information is available, which assumptions still need testing and how the research carries into the next stage.

We are building toward one connected platform for commercial real estate work. For your next project, begin with the site research West Kite can demonstrate today. Bring a parcel, an assemblage or a development brief to a demo, or explore the platform.

Frequently asked questions

What does West Kite do for real estate developers?

West Kite brings parcel, ownership and building context together for early site research. Development teams can investigate candidate properties and prepare more focused feasibility questions. Review the information available for your specific site and project type in a demo.

What information matters most in development site selection?

Start with the intended use, location, parcel configuration, ownership and access. Then investigate planning controls, utility capacity, physical constraints, timing and economics. The priority depends on the project: industrial development may turn on loading and power, while an infill housing project may turn on permitted use and achievable area.

How does ownership research help with a land assemblage?

An assemblage can involve multiple parcels, entities and rights. Match each parcel to its recorded owner and identify the interests needed for the project. West Kite’s property and ownership context supports the initial investigation; title review, agreements and direct discussions establish the path to site control.

Does zoning show exactly what I can build?

A zoning designation is the start of a planning review. Uses, density, height, setbacks, overlays and approval requirements can interact. Confirm the applicable rules and proposal-specific interpretation with the planning authority and your advisers. A mapped designation is not a building approval.

What is floor area ratio in real estate development?

Floor area ratio, or FAR, compares counted building floor area with site area under local rules. A 100,000-square-foot site at an assumed FAR of 2 gives an illustrative 200,000 square feet of counted floor area. It does not establish approved units, rentable area or a feasible design.

How should I compare West Kite, LightBox Vision and TestFit?

Compare them against the part of site selection you need to improve: property research, ownership investigation or design feasibility. Bring the same site and intended use to each evaluation. West Kite focuses on connected property context; confirm available fields and coverage, and distinguish research outputs from design and approval work.

What should I bring to a West Kite development demo?

Bring a site address or parcel, the intended use and the question holding up your decision. For an assemblage, include the neighboring parcels. A real example lets you evaluate the available property context and whether it gives your acquisitions and development team a useful starting point.

Start a conversation.